Coordination of Inspections and Code Compliance

Why Inspection Coordination Matters

Inspection coordination ensures that construction work is reviewed at the correct stages, complies with approved plans, and passes required inspections without delays or costly corrections. Poor coordination often results in failed inspections, rework, and extended project timelines.

Managing Inspection Scheduling


A licensed general contractor schedules inspections in proper sequence based on the scope of permitted work. This includes coordinating inspections for structural, electrical, plumbing, mechanical, and final approvals while ensuring work is complete and accessible for review.

Code Compliance During Active Construction


Code compliance is maintained throughout construction, not only at inspection milestones. Materials, installation methods, and structural work must align with approved plans and applicable building codes. If an inspection does not pass, required corrections are identified, coordinated, and re-inspections are scheduled efficiently to prevent delays or permit holds.