Illustrative coastal living room renovation with cream seating, pale flooring, natural oak ceiling detail and garden-facing glass doors

Treasure Island, Florida · MDI Custom Homes

Treasure Island Remodeling.Coastal Living, Considered.

MDI Custom Homes provides residential remodeling and general contracting in Treasure Island, with a focus on whole-home renovations, custom kitchens and bathrooms, interior reconfiguration and personalized spaces. This guide connects the finished design to the property information, local review and construction decisions that make a renovation buildable.

Florida Certified Building Contractor · CBC1267559
Treasure Island · Pinellas County, Florida

A renovation starts before finishes are chosen

Know the property.
Define the transformation.

A coastal renovation brings together two kinds of decisions: what you want the home to become, and what the existing building and applicable review process require. Address both early so that cabinetry, finishes and room layouts develop around a realistic project scope.

MDI Custom Homes LLC is a Florida Certified Building Contractor, CBC1267559. Our priority is remodeling and custom interiors: whole-home improvements, kitchens, bathrooms, reconfigurations, closets, walk-ins and media rooms. Additions and new construction remain available where they fit the project.

Whole-home remodeling

Coordinate the rooms, building systems and finish boundaries affected by a larger renovation.

Explore whole-home renovations →

Custom kitchens and baths

Resolve cabinetry, fixtures, substrates and installation requirements as connected decisions.

Explore custom kitchen remodeling →

Reconfigured interiors

Create better circulation and spaces with a purpose, from tailored storage to a dedicated media room.

Explore interior reconfiguration →
Illustrative coastal kitchen with ivory cabinetry, an oak island, pale green backsplash and brushed nickel hardware

A kitchen that fits the home and the daily routine

Refined finishes.
Resolved relationships.

Begin with the way the kitchen will be used: food preparation, storage, cleanup, seating and movement to adjoining rooms. Establish what can stay and which changes affect walls, services or adjacent finishes.

Then coordinate the cabinet plan with actual appliance information, countertop details, fixture requirements and installation access. Review the connections between those selections before fabrication or rough-in work depends on them.

A larger island can change circulation and service needs. A relocated sink can change the plumbing scope. The room and circulation guide and design coordination resource explain why layout decisions need coordination.

A sequence built around project readiness

Gather. Resolve.
Build with clarity.

Gather the property information

Bring available plans, permit records, known repair history and the changes you want to make.

Define the complete scope

Connect desired upgrades with necessary preparation, system changes and restoration of affected areas.

Resolve review and selections

Identify local requirements, design information and product decisions needed before dependent work.

Coordinate construction and closeout

Manage trade interfaces, inspections, field changes and applicable completion records.

Plan the project · Define the scope · Coordinate the work

A bathroom is more than its visible surfaces

Plan the assembly.
Then perfect the finish.

A bathroom scope should describe the preparation and installation beneath the tile as clearly as the tile itself. Coordinate the selected shower system, drain, penetrations and adjoining surfaces using the applicable manufacturer instructions and project requirements.

Before closing concealed work, establish which inspections or installation checks must occur. Product compatibility, substrate condition and the sequence of work matter even when the finished room looks simple.

Define the details that cross trade boundaries: valve and trim selection, niche location, glass attachment, lighting, ventilation and the relationship between the vanity, mirrors and outlets. Explore bathroom remodeling and inspection coordination.

Illustrative coastal bathroom with a double oak vanity, paired mirrors, ivory tile and a glass-enclosed shower

Local reference · City of Treasure Island

Use the current city checklist for the actual work.

The city’s Applications, Forms and Online Permitting page provides its current application, an interior-renovation checklist, discipline-specific checklists and access to the online permitting system. Establish the correct permit type and work classification before submitting.

The published process distinguishes a complete application, department review, corrections, approval and permit issuance. An application being received is not the same as a permit being issued. Coordinate construction commitments with the project’s actual authorization status.

Confirm the requirements for the address and complete proposed work, including applicable floodplain review. Describe the affected rooms, systems and structural elements consistently across the scope, drawings and application. See home renovation permits explained for the relationship between planning and construction authorization.

Local reference · Scope, valuation and review

Understand what substantial improvement and damage mean.

Treasure Island’s substantial improvement and substantial damage guide explains its floodplain review. In the published definitions, substantial improvement concerns improvement or repair costs reaching at least 50% of the structure’s pre-work market value; substantial damage concerns the cost to restore a damaged structure compared with its pre-damage value.

The relevant value is the structure, not the total property purchase price including land. The city’s Floodplain Administrator and Building Official make the determination. Confirm the accepted valuation, included costs, applicable exceptions and resulting requirements with the city for the actual property.

Do not treat a quick percentage calculation as project approval. Gather the required information early, before a layout or finish package depends on an assumed construction budget. Keep the complete proposed scope visible during review.

Existing work can affect the next project

Review open permits and prior repairs before setting the scope.

A new remodeling proposal does not erase the building’s prior work. Gather available permit numbers, inspection results, approved plans, known repairs and any unresolved completion items. Ask the city how those records affect the proposed application.

In its April 2026 permit-closeout reminder, Treasure Island specifically highlighted the importance of closing completed permits and the potential relationship between open storm-repair permits and later work.

For planning, keep three questions separate: Is the physical work complete? Were the required inspections and corrections completed? Does the permit record show the applicable closure? Resolve discrepancies with the responsible parties and city staff.

Do not assume that dividing one project into smaller applications removes applicable review requirements. Present the complete work and request direction on how prior and proposed activity will be evaluated. Our project closeout guide explains the information to carry through the handoff.

Specify performance alongside appearance

Choose materials for their location and installation conditions.

A label such as “coastal,” “durable” or “water-resistant” is not a complete specification. Identify the product, its intended location, the manufacturer’s stated uses, required preparation and maintenance expectations. Compare those requirements with the actual conditions in the home.

  • Cabinetry: Review construction, finish, hardware, storage use and the installation conditions required by the selected supplier.
  • Flooring: Establish the substrate, preparation, product limitations and transitions to retained flooring or thresholds.
  • Metal components: Confirm suitability for the actual exposure and follow the manufacturer’s care instructions.
  • Wet areas: Coordinate the complete assembly, including connections and penetrations, rather than selecting each visible component independently.
  • Maintenance: Keep the relevant cleaning, care and warranty information with the final product record.

For any known water intrusion or damaged material, resolve the investigation and required corrective work before relying on a finish replacement to solve the condition. The extent of preparation should be explicit in the project scope.

An illustrative remodeling example

A removed wall changes more than the floor plan.

Suppose a homeowner wants to open a kitchen toward the living room. Start by establishing the wall’s role and the affected building services through appropriate investigation and professional evaluation. The desired opening should be developed alongside the existing structure.

Then identify the full area of follow-on work: ceiling and floor repairs, cabinet limits, lighting positions, outlets, ventilation routes and finish transitions. Where an exact finish match is uncertain, agree on a defined repair boundary or a deliberate transition.

A useful scope statement answers: What is removed? What supports or replaces it? Which systems change? What adjacent work is restored? What remains excluded or unresolved? Which design and approval steps must precede construction?

Read structural modifications and coordination with architects and engineers for the supporting decisions. This example illustrates planning relationships; it does not determine whether a particular wall can be removed.

From selections to the next trade

Release work when its prerequisites are ready.

A date on a schedule is useful only when the information, materials and preceding work needed for that activity are ready. Connect each major decision to the work that depends on it.

  • Before cabinet fabrication: Verify controlling dimensions, approved layouts and relevant appliance requirements.
  • Before affected rough-ins: Resolve fixture information, service locations and the current coordinated plan.
  • Before covering concealed work: Complete the required review and inspections, and address corrections.
  • Before finish installation: Confirm substrate readiness, material availability and the intended junctions with adjacent work.
  • Before handoff: Review remaining scope items, applicable approvals and the product information the owner will need.

If a field discovery changes the plan, identify the design, cost, schedule and review consequences before dependent work proceeds. Record the agreed change and keep the trades working from the current information.

Remodeling and custom interiors in Treasure Island

A coastal home.
A more personal way to live.

Bring the property address, your priorities and any available plans or permit records. Discuss how you want to use the home, which features should remain and whether occupancy or access will affect the construction plan.

Explore nearby resources for Madeira Beach, St. Pete Beach and South Pasadena, or visit the Pinellas County remodeling guide.

Clear answers for a considered decision

Your home.
Your questions.

Does MDI Custom Homes provide remodeling in Treasure Island?

Yes. MDI Custom Homes provides residential remodeling and general contracting in Treasure Island, emphasizing whole-home renovations, custom kitchens and bathrooms, reconfigured interiors and personalized spaces.

Where do I find Treasure Island remodeling permit requirements?

Use the city’s current Applications, Forms and Online Permitting page and the checklists relevant to the actual work. Confirm the address, permit classification, complete scope and applicable review before scheduling construction.

Does the 50% rule use the total property purchase price?

The city’s published guidance uses the applicable market value of the structure, excluding land. Confirm the accepted valuation and included project costs with the city; a homeowner’s calculation does not replace the official determination.

Why review previous permits before planning a remodel?

Open permits, prior repairs and unresolved inspection or completion items can affect the information and review needed for new work. Gather the records and ask the city how they relate to the proposed project.

Can I replace finishes before resolving an underlying water issue?

The project should identify and address the relevant underlying condition before finish work depends on it. Define the investigation, necessary preparation and corrective work with the appropriate professionals and include it in the scope.

What should I bring to a Treasure Island remodeling consultation?

Bring the address, desired improvements, available drawings and permit records, known repairs or conditions, inspiration, budget priorities and any timing, occupancy or access constraints.

A more considered coastal home

Let’s plan your
Treasure Island renovation.

Share the changes you have in mind. We can discuss the scope and next steps toward a home that feels more useful, personal and complete.

Design imagery is illustrative and does not depict completed MDI projects.